How to verify power to IT cabinet equipment
Modified on: Thu, Mar 13 2025 11:33 AMPURPOSE
A store lost power and needs to turn all IT equipment back on.
PROCESS
- Turn on all network equipment in the top of the IT Cabinet.
- All equipment should have similar lights as shown here:
- SonicWall
- Switch
- Modem
- NetGear (Backup Internet)
- Server
- Press the power button on the front to turn on the server.
- Point of Sale (POS)
- Turn on POS Terminal by pressing the red button on the bottom left corner behind the monitor and pressing the power button on the mini Dell PC.
-
- Kiosk
- Power cycle the Kiosk by unplugging and plugging in the power cord and turning on the power switch.
-
- Gate BFT
- Power cycle the gate by reseating the network cable.
- Gate Magnetic
- Turn the breaker off then back on
- Tunnel Computer
- Turn on the Tunnel Controller by pressing the power button.
- Send Station
- Turn on Send station:
HISTORY
Revised Date | Revised By | Revisions |
Unknown | Unknown | Created Document |
1/3/2021 | Karl Futscher | Checked for sensitive content |
11/16/2023 | Ciera Clapp | Updated formatting |
4/9/2024 | Yolanda Terrazas-Franco | Updated formatting and grammar mistakes fixed |
8/24/2024 | Andrew Poskey | Moved to Fresh |
3/13/2025 | Andrew Poskey | Updated title and content formatting |