How to verify power to IT cabinet equipment

Modified on: Thu, Mar 13 2025 11:33 AM

PURPOSE

A store lost power and needs to turn all IT equipment back on. 


PROCESS

  1. Turn on all network equipment in the top of the IT Cabinet. 
  2. All equipment should have similar lights as shown here:
  3. SonicWall
  4. Switch
  5. Modem
  6. NetGear (Backup Internet)
    • NETGEAR 4G LTE Modem - LM1200 | Mobile Broadband | NETGEAR
  7. Server
    • Press the power button on the front to turn on the server.
  8. Point of Sale (POS)
    • Turn on POS Terminal by pressing the red button on the bottom left corner behind the monitor and pressing the power button on the mini Dell PC.
  9. Kiosk
    • Power cycle the Kiosk by unplugging and plugging in the power cord and turning on the power switch.
    •  
  10. Gate BFT
    • Power cycle the gate by reseating the network cable.
  11. Gate Magnetic
    • Turn the breaker off then back on
  12. Tunnel Computer
    • Turn on the Tunnel Controller by pressing the power button.
  13. Send Station
    • Turn on Send station:


HISTORY

Revised Date Revised By Revisions
Unknown Unknown Created Document
1/3/2021 Karl Futscher Checked for sensitive content
11/16/2023 Ciera Clapp Updated formatting
4/9/2024 Yolanda Terrazas-Franco Updated formatting and grammar mistakes fixed
8/24/2024 Andrew Poskey Moved to Fresh
3/13/2025 Andrew Poskey Updated title and content formatting


Was this answer helpful?